ClientGenesis Energy

Scope
Engaged as consultant to advise on the consolidation of critical operations into one location.

Result
Following a CADwalk workshop two optimised layouts were provided as formal drawings for the client to proceed with presenting their business case to key decision makers within the Company.

Benefits
Operational staff were involved in the design process from the start, this greatly reduced the amount of resistance to change that is normally present when a relocation or reorganisation is planned.

This significantly reduced the likelihood for project delay and overspend.