**Result**  
 CADwalk Digital workshop allowed full 1:1 scale validation of Control Room designs and integrated stakeholder buy in, minimising and cost spent on change requests, and mitigating the risk of design being sub-optimal to operational work-flow.

**Benefits**  
 Delivery of two major packages by the same vendor ensured design issues where caught early and works scheduled to minimise impact.

Alternative video wall solution was offered during tender phase saving 40% on backend technology with increased capabilities.

[View full post](https://www.cadwalk.global/case-studies/casestudy/wa-utility)

```json
{
  "@context" : "http://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "CADwalk Critical Rooms"
  },
  "dateModified" : "2022-06-03T08:24:49.862Z",
  "datePublished" : "2020-10-30T05:45:00Z",
  "headline" : "WA Utility",
  "image" : {
    "@type" : "ImageObject",
    "height" : 375,
    "url" : "https://f.hubspotusercontent30.net/hubfs/9244986/Cadwalk_February2021/images/wa-utility-1-675x375.jpg",
    "width" : 675
  },
  "mainEntityOfPage" : "https://www.cadwalk.global/case-studies/casestudy/wa-utility",
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "height" : 60,
      "url" : "/hs/hsstatic/content_shared_assets/static-1.4092/img/default-amp-logo.png",
      "width" : 60
    },
    "name" : "Case Studies"
  }
}
```